The river called "Meuse" owns many secondary channels. We can find a large diversity of species in these wetlands which participate as well to the good carrying out of the biological cycle of two fish species belonging to the french red list of IUCN, pike and mud loach species.The secondary channel of Charny-sur-Meuse is considered as damaged. The cow stamping, the connection level with the Meuse river and superficial flowing coming from quarries explain the damage.In 2017, the Meuse Federation of Fishing and Protection of the Aquatic Environment did a study by telemetry about pike and a fish inventory in the secondary channel which enable today to create a project in order to restore and improve its functioning for two species.Some digging works, future plannings which will be achieved in the quarry and a change of agricultural practice in the meadow will permit to achieve these objectives. Thanks to this project, the impact of GSM company about secondary channel functioning will have a positive evolution. The company which represented a disturbing element for the environment (by the presence of superficial flowing between the quarry and the wetland) will become an incentive factor for restoration and protection of works.

 

Stacking - Piquetage

This morning, a stacking operation was realized on the study site. - Ce matin une opération de piquetage a été réalisée sur le site d’étude.

En savoir plus
23juil

Some topographic measurements - Quelques relevés topographiques

Sébastien CORMONT, project manager, and Hervé SALVÉ, manager of the Federation, realized some topographic measurements before starting works. - Sébastien CORMONT, responsable du projet, et Hervé SALVÉ, directeur de la Fédération, ont réalisé quelques relevés topographiques avant le démarrage des travaux.

En savoir plus
20juil

Visit of the international jury - Visite du jury international

Today, Stéphane RIVIÈRE, international member of the Quarry Life Award jury, accompanied with Valérie CAUCHI (French Quarry Life Award coordinator), Marine GAUDUCHEAU (GSM environment coordinator), Elodie RUSSIER-DECOSTER (UICN France project officer) and Romain SIRJEAN (Land and environment Manager Expert) participated in a project presentation by Sébastien CORMONT (project manager) who was accompanied by Hervé SALVÉ (manager of the Federation). - Aujourd’hui, Stéphane RIVIÈRE, membre du jury...

En savoir plus
17juil

Works will start very soon - Bientôt les travaux

“Hydrotech élagage” company was recruited to realize the works which will begin from July 23rd - L’entreprise « Hydrotech élagage » a été recrutée pour réaliser les travaux qui commenceront à partir du 23 juillet

En savoir plus
12juil

A project presentation for the GSM employees - Présentation du projet aux salariés de GSM

This morning, Sébastien CORMONT, Meuse federation of fishing and protection of the aquatic environment project manager, met employees of the GSM Company for a project presentation. - Ce matin, Sébastien CORMONT, référent du projet à la Fédération de la Meuse pour la Pêche et la Protection du Milieu Aquatique, a rencontré les salariés de l’entreprise GSM pour une présentation d’une heure du projet.

En savoir plus
26juin

Des brochets et des loches d’étang !

La semaine dernière nous avons réalisé un inventaire piscicole dans l’annexe hydraulique de Charny-sur-Meuse. Les deux espèces cibles du projet, inscrites sur la liste rouge de l’UICN, ont été inventoriées dans la zone humide déconnectée du fleuve.

En savoir plus
21juin

Pikes and mud loaches!

Last week we did a fish inventory in the secondary channel of Charny-sur-Meuse. The two target species of our project, classed by the IUCN red list, were inventoried.

En savoir plus
21juin

Students of the MFR visited the study site - Les élèves de la MFR ont visité le site d’étude.

Students of “Maison Familiale Rurale” (MFR) of Damvillers will participate in the future work. They will realize educational works. Last Wednesday, they discovered the study site and the project. - Les élèves de la Maison Familiale Rurale (MFR) de Damvillers participeront aux travaux sous forme de chantiers pédagogiques. Mercredi dernier, ils ont découvert le site d’étude et le projet.

En savoir plus
15juin

Local authorities invest in the project- Des collectivités territoriales investissent dans le projet

The Meuse federation of fishing and protection of the aquatic environment found four financial partners. Several local authorities of Meuse will support the project. - La Fédération de la Meuse pour la Pêche et la Protection du Milieu Aquatique a trouvé quatre partenaires financiers pour boucler le plan de financement du projet. Plusieurs collectivités locales du département soutiennent le projet.

En savoir plus
04juin

A new documentary of secondary channel restoration - Sortie d’un documentaire sur la restauration de

Discover in the documentary “Sur les traces du brochet en vallée de Meuse” some views of the secondary channel of Charny-sur-Meuse witch will be restore this year. - Découvrez dans le documentaire « Sur les traces du brochet en vallée de Meuse » quelques images de l’annexe hydraulique de Charny-sur-Meuse qui sera restaurée cette année.

En savoir plus
03mai

Administrative authorization obtained - Autorisation de travaux obtenue

Our project must respect the French laws on Environment and Water. On Wednesday, April 18th, 2018, the French administration (Department directorate of territory of Meuse) gave it agreement for our project realization. - Notre projet est sujet à la réglementation sur la loi sur l’eau. Le 18 avril 2018, la DDT de la Meuse a donné son accord pour la réalisation des travaux.

En savoir plus
25avr

Some facts about the pike’s reproduction

This is the end of the reproduction of pike in the Meuse’s valley. Here is some data from our study of tracking pike by remote sensing, with a focus on the hydrological extend concerned by our project.

En savoir plus
18avr

Des informations sur la reproduction du brochet

Nous arrivons à la fin de la période de reproduction du brochet en vallée de Meuse. Voici quelques éléments observés lors de notre suivi par télédétection, avec un focus sur l’annexe hydraulique concernée par notre projet.

En savoir plus
18avr

Our project in the local newspaper - Notre projet dans le journal local

On April, the 6th 2018, the “Est Républicain” newspaper published an article on the project of Charny-sur-Meuse involved in the competition of the Quarry Life Award. - Vendredi 6 avril, l’Est Républicain a publié un article sur le projet de Charny-sur-Meuse participant au concours du Quarry Life Award.

En savoir plus
09avr

A beneficial project for many species - Un projet bénéfique pour beaucoup d’espèces

Following to the first meeting on February, the 6th 2018, the Meuse Federation of fishing and protection of the aquatic environment has requested the Meuse CPIE to know the point of view of naturalists about our project. - Suite au comité de pilotage du 6 février 2018, la Fédération de Pêche de la Meuse a sollicité le CPIE de la Meuse pour connaître l’avis de naturalistes sur notre projet.

En savoir plus
05mar

Un premier comité de pilotage enrichissant

Mardi 6 février a eu lieu le premier comité de pilotage de notre projet. Les échanges constructifs entre les différents partenaires vont permettre à la Fédération de Pêche de la Meuse de faire avancer rapidement le projet.

En savoir plus
13fév

A first successful meeting

On Tuesday, February 6th took place the first meeting of our project. The constructive dialogues between the various partners will allow the Meuse federation of fishing and protection of the aquatic environment to advance quickly.

En savoir plus
13fév

Next week, first meeting - Premier comité de pilotage la semaine prochaine

Some news about our project of restoration and optimization of a secondary channel at Charny-sur-Meuse... La première grande étape de notre projet de restauration et d’optimisation de la fonctionnalité d’une annexe hydraulique à Charny-sur-Meuse va débuter ...

En savoir plus
02fév